News Center>>CHINA NUCLEAR INDUSTRY HUA XING CONSTRUCTION COMPANY LIMITED!

  • <div id="afahh"></div>
    1. <col id="afahh"><video id="afahh"></video></col><hgroup id="afahh"><dl id="afahh"></dl></hgroup>
      <em id="afahh"><label id="afahh"><mark id="afahh"></mark><small id="afahh"><optgroup id="afahh"></optgroup></small></label></em><canvas id="afahh"></canvas>
      1. <meter id="afahh"><figcaption id="afahh"></figcaption><figure id="afahh"></figure></meter>

        <section id="afahh"></section><mark id="afahh"></mark>
            <section id="afahh"></section>
             
            News Center
            News
            Location:Home >> News Center >> News
            Fangchenggang unit1 connected to grid
            time:2015-11-25  from:HXCC  Viewed:3239 times

                Unit 1 of Fangchenggang NPP built by HXCC was connected to grid at 15:17 on 25 October, the reactor formal enters into commercial operation preparation phase .

                Fangchenggang NPP is the first nuclear power plant in the Beibu gulf areas in Guangxi Province, phase I adopts CPR-1000 (PWR), China’s own nuclear power technology, with capacity of 1080MW. It will provide 15 billion 1kW·h clean energy per year that is safe and economical after the completion.

            closed
             
            Copyright © 2011 kohul.com
            All Rights Reserved CHINA NUCLEAR INDUSTRY HUA XING CONSTRUCTION COMPANY LIMITED
            [苏ICP备05006750号]

            银河娱乐 |银河娱乐平台 |银河娱乐集团 | |手机版 | | 澳门皇家赌场|银河娱乐|银河娱乐|银河娱乐|银河娱乐|银河娱乐|